Phase 3 complete! Stay tuned for phase 4, which will be either curtains or stair railing.
Phase 1 was getting the supports and main deck surface up.
Phase 2 was the railing.
Phase 3 was the Pergola.
Lumber costs were on the rise so utilizing steel components made sense. Steel stair stringers and electrical conduit for railing makes for a unique look and lower wood costs. Unfortunately this isn’t a project I can tout as being a lone wolf kind of thing as I needed another set of hands for most of it.